2012/115/EU: Commission Implementing Decision of 10 February 2012 laying down rul... (32012D0115)
INHALT
2012/115/EU: Commission Implementing Decision of 10 February 2012 laying down rules concerning the transitional national plans referred to in Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions (notified under document C(2012) 612) Text with EEA relevance
- COMMISSION IMPLEMENTING DECISION
- of 10 February 2012
- laying down rules concerning the transitional national plans referred to in Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions
- (notified under document C(2012) 612)
- (Text with EEA relevance)
- (2012/115/EU)
- Article 1
- Combustion plants to be included in the transitional national plans
- Article 2
- Content of the transitional national plans
- Article 3
- Setting emission ceilings in the transitional national plans
- Article 4
- Implementation of the transitional national plan
- Article 5
- Subsequent changes to the transitional national plan
- Article 6
- Compliance monitoring, remedial action and reporting to the Commission
- Article 7
- ANNEX
- 1.
- Combustion plants to be included in the transitional national plan
- 2.
- Combustion plant data to be included in the transitional national plan
- 3.
- Determining the emission ceilings
- 3.1.
- Calculation method for the individual plant contributions to the 2016 and 2019 emission ceilings
- 3.1.1. General case
- 3.1.2. Specific case of plants firing multiple fuel types and/or consisting of multiple plant types
- 3.1.3. Minimum rate of desulphurisation (MDR)
- 3.2.
- Relevant emission limit values and minimum rates of desulphurisation for calculating the 2016 emission ceilings
- 3.3.
- Relevant emission limit values and minimum rates of desulphurisation for calculating the 2019 emission ceilings
- 3.4.
- Calculating the emission ceilings
- 3.4.1. Calculating the 2016 and 2019 emission ceilings
- 3.4.2. Calculating the 2017, 2018 and 2020 emission ceilings
- 4.
- Subsequent changes to transitional national plans
- Appendix A
- Appendix B
- Appendix C
- Appendix D
Feedback