COMMISSION DECISION (EU) 2024/2418
of 11 December 2023
on the measure State aid SA.53625 (2021/C) implemented by Germany for Lignite phase-out
(notified under document C(2023) 8551)
(Only the English text is authentic)
(Text with EEA relevance)
1.
PROCEDURE
2.
SCOPE OF THE DECISION
3.
DETAILED DESCRIPTION OF THE NOTIFIED MEASURE
3.1.
Germany’s climate objectives and the objective of the notified measure
3.2.
Elaboration of policy measures
3.3.
Legal basis
3.3.1.
Initial legal basis
Target date |
Overall target level (GW) |
Hard coal target (GW) |
Lignite target (GW) |
||
31.12.2022 |
30 |
15 |
15 |
||
1.4.2030 |
17 |
8 |
9 |
||
31.12.2038 |
0 |
0 |
0 |
||
|
3.3.2.
Amendment to the initial legal basis
3.4.
Grounds for initiating the formal investigation procedure
3.4.1.
Forgone profits reach far into the future
3.4.2.
Deferred closure mechanism
3.4.3.
Alternative scenarios submitted by Germany
3.4.4.
Additional mine rehabilitation costs
3.5.
Amended RWE measure/developments after the Opening Decision
Operator |
Name of the installation |
MW (net) |
Date of transfer to deferred closure mechanism |
Closure date |
RWE |
Niederaußem D |
297 |
- |
31.12.2020 |
RWE |
Niederaußem C |
295 |
- |
31.12.2021 |
RWE |
Neurath B |
294 |
- |
31.12.2021 |
RWE |
Weisweiler E |
321 |
- |
31.12.2021 |
RWE |
Neurath A |
294 |
- |
1.4.2022 |
RWE |
Frechen /Wachtberg |
120 |
- |
31.12.2022 |
|
(Brikettierung) |
(out of 176 ) |
|
|
3.5.1.
Postponement of final decommissioning of two units from end-2022 to March 2024
Operator |
Name of the installation |
MW (net) |
Date of transfer to deferred closure mechanism |
Closure date |
RWE |
Niederaußem D |
297 |
- |
31.12.2020 |
RWE |
Niederaußem C |
295 |
- |
31.12.2021 |
RWE |
Neurath B |
294 |
- |
31.12.2021 |
RWE |
Weisweiler E or F(35) |
321 |
- |
31.12.2021 |
RWE |
Neurath A |
294 |
- |
1.4.2022 |
RWE |
Frechen/Wachtberg |
120 |
- |
31.12.2022 |
|
(Brikettierung) |
(out of 176 ) |
|
|
RWE |
Neurath D |
607 |
- |
31.3.2024 |
RWE |
Neurath E |
604 |
- |
31.3.2024 |
RWE |
Weisweiler E or F(36) |
321 |
- |
1.1.2025 |
LEAG |
Jänschwalde A |
465 |
31.12.2025 |
31.12.2028 |
LEAG |
Jänschwalde B |
465 |
31.12.2027 |
31.12.2028 |
RWE |
Weisweiler G or H |
663 |
- |
1.4.2028 |
|
|
or |
|
|
|
|
656 |
|
|
LEAG |
Jänschwalde C |
465 |
- |
31.12.2028 |
LEAG |
Jänschwalde D |
465 |
- |
31.12.2028 |
RWE |
Weisweiler G or H |
663 |
- |
1.4.2029 |
|
|
Or |
|
|
|
|
656 |
|
|
LEAG |
Boxberg N |
465 |
- |
31.12.2029 |
LEAG |
Boxberg P |
465 |
- |
31.12.2029 |
RWE |
Niederaußem G or H |
628 |
- |
31.12.2029 |
|
|
or |
|
|
|
|
648 |
|
|
RWE |
Niederaußem K |
944 |
- |
31.3.2030 |
RWE |
Neurath F (BoA 2) |
1 060 |
- |
31.3.2030 |
RWE |
Neurath G (BoA 3) |
1 060 |
- |
31.3.2030 |
RWE |
Niederaußem G or H |
628 |
31.12.2029 |
31.12.2033 |
|
|
or |
|
|
|
|
648 |
|
|
Saale Energie(37) |
Schkopau A |
450 |
- |
31.12.2034 |
Saale Energie |
Schkopau B |
450 |
- |
31.12.2034 |
LEAG |
Lippendorf R |
875 |
- |
31.12.2035 |
EnBW |
Lippendorf S |
875 |
- |
31.12.2035 |
LEAG |
Schwarze Pumpe A |
750 |
- |
31.12.2038 |
LEAG |
Schwarze Pumpe B |
750 |
- |
31.12.2038 |
LEAG |
Boxberg R |
640 |
- |
31.12.2038 |
LEAG |
Boxberg Q |
857 |
- |
31.12.2038 |
Operator |
Name of the installation |
Opening / operation date |
Closure date |
RWE |
Niederaußem D |
1968 |
31.12.2020 |
RWE |
Niederaußem C |
1965 |
31.12.2021 |
RWE |
Neurath B |
1972 |
31.12.2021 |
RWE |
Weisweiler E or F(38) |
1965, 1967 |
31.12.2021 |
RWE |
Neurath A |
1972 |
1.4.2022 |
RWE |
Frechen/Wachtberg |
1962 |
31.12.2022 |
|
(Brikettierung) |
|
|
|
|
|
|
RWE |
Neurath D |
1975 |
31.3.2024 |
RWE |
Neurath E |
1976 |
31.3.2024 |
RWE |
Weisweiler E or F(39) |
1965, 1967 |
1.1.2025 |
RWE |
Weisweiler G or H |
1974, 1975 |
1.4.2028 |
|
|
|
|
|
|
|
|
RWE |
Weisweiler G or H |
1974, 1975 |
1.4.2029 |
|
|
|
|
|
|
|
|
RWE |
Niederaußem G or H |
1974, 1974 |
31.12.2029 |
|
|
|
|
|
|
|
|
RWE |
Niederaußem K |
2003 |
31.3.2030 |
RWE |
Neurath F (BoA 2) |
2012 |
31.3.2030 |
RWE |
Neurath G (BoA 3) |
2012 |
31.3.2030 |
RWE |
Niederaußem G or H |
1974, 1974 |
31.12.2033 |
|
|
|
|
|
|
|
|