COMMISSION IMPLEMENTING REGULATION (EU) No 1113/2014

of 16 October 2014

establishing the form and technical details of the notification referred to in Articles 3 and 5 of Regulation (EU) No 256/2014 of the European Parliament and of the Council and repealing Commission Regulations (EC) No 2386/96 and (EU, Euratom) No 833/2010

THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 256/2014 of the European Parliament and of the Council of 26 February 2014, concerning the notification to the Commission of investment projects in energy infrastructure within the European Union, replacing Council Regulation (EU, Euratom) No 617/2010 and repealing Council Regulation (EC) No 736/96 (1), and in particular Article 7 thereof,
Whereas:
(1) In order to gather comparable data and to simplify the reporting by Member States or their delegated entities or bodies referred to in Article 3 of Regulation (EU) No 256/2014, notifications to be made should be standardized by the use of reporting tables. Therefore, the provisions concerning the form and other technical details of the notification of data and information should be adopted.
(2) Following the repeal of Council Regulation (EC) No 736/96 (2) by Regulation (EU) No 256/2014, Commission Regulation (EC) No 2386/96 (3) should also be repealed.
(3) Following the annulment of Council Regulation (EU, Euratom) No 617/2010 (4) by the European Court of Justice (5), Commission Regulation (EU, Euratom) No 833/2010 (6) should be also repealed by this Regulation,
HAS ADOPTED THIS REGULATION:

Article 1

The form and technical details of the notification to the Commission of data and information on investment projects in energy infrastructure referred to in Articles 3 and 5 of Regulation (EU) No 256/2014 shall be as set out in the Annex to this Regulation.

Article 2

Regulations (EC) No 2386/96 and (EU, Euratom) No 833/2010 are repealed.

Article 3

Member States shall ensure coherence of statistical information reported based on the template in the Annex and statistical information reported under Regulation (EC) No 1099/2008 on energy statistics.

Article 4

This Regulation shall enter into force on the twentieth day following that of its publication in the
Official Journal of the European Union
.
This Regulation shall be binding in its entirety and directly applicable in the Member States in accordance with the Treaties.
Done at Brussels, 16 October 2014.
For the Commission
The President
José Manuel BARROSO
(1)  
OJ L 84, 20.3.2014, p. 61
.
(2)  Council Regulation (EC) No 736/96 of 22 April 1996 on notifying the Commission of investment projects of interest to the Community in petroleum, natural gas and electricity sectors (
OJ L 102, 25.4.1996, p. 1
).
(3)  Commission Regulation (EC) No 2386/96 of 16 December 1996 applying Council Regulation (EC) No 736/96 on notifying the Commission of investment projects of interest to the Community in the petroleum, natural gas and electricity sectors (
OJ L 326, 17.12.1996, p. 13
).
(4)  Council Regulation (EU, Euratom) No 617/2010 of 24 June 2010 concerning the notification to the Commission of investment projects in energy infrastructure within the European Union and repealing Regulation (EC) No 736/96 (
OJ L 180, 15.7.2010, p. 7
).
(5)  Judgement of the Court of Justice of 6 September 2012 in Case C-490/10, Parliament v. Council (ECR 2012, p. I-0000).
(6)  Commission Regulation (EU, Euratom) No 833/2010 of 21 September 2010 implementing Council Regulation (EU, Euratom) No 617/2010 concerning the notification to the Commission of investment projects in energy infrastructure within the European Union (
OJ L 248, 22.9.2010, p. 36
).

ANNEX

[Bild bitte in Originalquelle ansehen]
Text of image
O1 — OIL REFINING
Reporting year 20XX
Member State
in thousand tonnes per year
Type of infrastructure
Annex point 1.1
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2)+ 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2)+ 2(3)+ 4+ 5 (1) a)
Additions to
be commissioned
(under construction + FID)
Art. 1(2)+ 5 (1) c)
Infrastructure to
be decommissioned
Art. 1(2)+ 2(5) + 5 (2)
Position at 1/1/Y
Non-operational
[>3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Capacity
Capacity
Number
Capacity
Number
Capacity
Number
Capacity
Capacity
Number
Capacity
Capacity
Distillation (*)
Atmospheric distillation
with CCS/CCS ready
Vacuum distillation
with CCS/CCS ready
Cracking (**)
Cracking (Thermal)
— Visbreaking and/or thermal
— Coking
— Other
with CCS or capture ready
Cracking (catalytic)
— Fluid catalytic cracking — Hydrocracking
— Other
with CCS or capture ready
Reforming (**)
(Naphtha and isomerisation)
with CCS or capture ready
[Bild bitte in Originalquelle ansehen]
Text of image
Desulphurisation (gasoil, HFO, other)
with CCS or capture ready
Alkylation Polymerisation Isomerisation (C4)
with CCS or capture ready
Etherification (MTBE, TAME, ETBE) — Other
with CCS or capture ready
Supplementary Info Art. 5 (3)
Indication of e.g. reasons for investment, delays, problems for new infrastructure
(*) installations of a capacity ≥ 1 Mio tonnes/y
(**) installations with a minimum capacity of 500 t/day
NB: under construction and FID (Final Investment Decision) include renovation
[Bild bitte in Originalquelle ansehen]
Text of image
O2 — OIL TRANSPORT Reporting year 20XX
Member State
Type of infrastructure Annex point 1.2
Existing infrastructure Art. 5 (3)
Infrastructure under construction Art. 1(2)+ 2(4) + 4+ 5 (1) a)
Planned infrastructure (FID) Art. 1(2) + 2(3) + 4+ 5 (1) a)
Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c)
Installations to be decommissioned Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
Crude oil transport pipe- lines (*)
Petroleum product pipe- lines (**)
Supplementary Info Art. 5 (3)
Indication of e.g. reasons for investment, delays, problems for new infrastructure
(*) with a capacity ≥ 3 Mio Metric tonnes/year for New pipelines + extension/lengthening ≥ 30 km
(**) with a capacity ≥ 1.5 Mio Metric tonnes/year for New pipelines + extension/lengthening ≥ 30 km
NB: under construction and FID (Final Investment Decision) include renovation
[Bild bitte in Originalquelle ansehen]
Text of image
O3 — OIL CROSS-BORDER TRANSPORT Reporting year 20XX
Member State
Transport capacity (Metric Tonnes per day)
Cross-border transmission projects and essential links in interconnecting national or international networks Annex point 1.2
Existing infrastructure Art. 5 (3)
Infrastructure under construction Art. 1(2)+ 2(4)+ 4+ 5 (1) a)
Planned infrastructure (FID) Art. 1(2) + 2(3)+ 4+ 5 (1) a)
Additions to be commissioned (under construction + FID) Art. 2(3) + 5 (1) c)
Infrastructure to be decommissioned (FID) Art. 1(2) + 2(5) + 5 (2)
TEN-E projects
Supple- mentary info Art 5(3)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Ref.
TO (*)
FROM (**)
TO (*)
FROM (**)
TO (*)
FROM (**)
TO (*)
FROM (**)
TO (*)
FROM (**)
TO (*)
FROM (**)
TO (*)
FROM (**)
Crude oil pipelines Annex point 1.2
Cross — border/interconnecting point No 1 (location — indicate MS/Third countries)
Petroleum products pipelines Annex point 1.2
Cross — border/interconnecting point n° 1 (location — indicate MS/Third countries)
(*) to the reporting MS
(**) from the reporting MS
NB: under construction and FID (Final Investment Decision) include renovation
[Bild bitte in Originalquelle ansehen]
Text of image
O4 — OIL STORAGE Reporting year 20XX
Member State
Type of infrastructure Annex point 1.3
Existing infrastructure Art. 5 (3)
Infrastructure under construction (*) Art. 1(2)+ 2(4) + 4+ 5 (1) a)
Planned infrastructure (FID) (*) Art. 1(2)+ 2(3)+ 4+ 5 (1) a)
Additions to be commissioned (Under construction + FID) (*) Art. 1(2)+ 5 (1) c)
Infrastructure to be decommissioned (*) Art. 1(2)+ 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [>3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Storage capacity (m3)
Storage capacity (m3)
Number
Storage capacity (m3)
Number
Storage capacity (m3)
Number
Storage capacity (m3)
Storage capacity (m3)
Number
Storage capacity (m3)
Storage capacity (m3)
Crude oil Annex 1.3
Storage installations
Tanks
Petroleum products Annex 1.3
Storage installations
Tanks
Supplementary info Article 5(3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
(*) Installations with a capacity ≥ 150 000 m3 and tanks with a capacity ≥ 100 000 m3
NB: under construction and FID (Final Investment Decision) include renovation
[Bild bitte in Originalquelle ansehen]
Text of image
G1 — GAS TRANSMISSION Reporting year 20XX
Member State
Type of infrastructure (*) Annex point 2.1
Existing infrastructure Art 5(3)
Infrastructure under construction Art. 1(2)+ 2(4) + 4+ 5 (1) a)
Planned infrastructure (FID) Art. 1(2)+ 2(3)+ 4+ 5 (1) a)
Additions to be commissioned (under construction + FID) Art. 1(2)+ 5 (1) c)
Infrastructure to be decommissioned Art. 1(2)+ 2(5) + 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
Transmission pipelines Annex 2.1
Total power (MW)
Number
Total Power (MW)
Number
Total Power (MW)
Number
Total Power (MW)
Total Power (MW)
Number
Total Power (MW)
Total Power (MW)
Compressor substations (**) Annex 2.1
Supplementary Info Art. 5 (3)
Indication of general comments, including e.g. the case of existing installations non operational for a period of more than 3 years
(*) See definition in Annex 2.1 of the Council regulation: Transport pipelines that form part of a network which mainly contains high-pressure pipelines excluding pipelines that form part of an upstream pipeline network and excluding the part of high pressure pipelines primarily used in the context of local distribution of natural gas.
(**) connected to transmission pipelines
NB: under construction and FID (Final Investment Decision) include renovation
[Bild bitte in Originalquelle ansehen]
Text of image
G2 — GAS CROSS-BORDER TRANSMISSION Reporting year 20XX
Member State
Maximum Technical transmission capacity (Nm3/d)
Cross-border transmission infrastructure Annex point 2.1
Existing infrastructure Art. 5 (3)
Infrastructure Under Construction Art. 1(2) +2(4)+ 4+ 5 (1) a)
Planned infrastructure (FID) Art. 1(2)+ 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned Art. 1(2) + 2(5)+ 5 (2)
TEN — E project Annex 2.1
Supple- mentary info (*) Article 5(3)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Ref.
TO (**)
FROM (***)
TO
FROM
TO
FROM
TO
FROM
TO
FROM
TO
FROM
TO
FROM
Cross-border point No 1 (location — indicate MS/Third countries)
Cross-border point No 2 (location — indicate MS/Third countries)
(*) Indication of e.g. of delays, problems for new infrastructure or of the reasons of the increase in technical transmission capacity at a cross-border point in the absence of investment projects in new pipelines
(**) to the reporting MS
(***) from the reporting MS
NB: under construction and FID (Final Investment Decision) include renovation
[Bild bitte in Originalquelle ansehen]
Text of image
G3 — LNG TERMINALS Reporting year 20XX
Member State
Type of infrastructure Annex point 2.2
Existing infrastructure Art. 5 (3)
Infrastructure under construction (*) Art. 1(2)+ 2(4) + 4+ 5 (1) a)
Planned infrastructure (*) (FID) Art. 1(2)+ 2(3)+ 4+ 5 (1) a)
Additions to be commissioned (*) (under construction + FID) Art. 1(2)+ 5 (1) c)
Infrastructure to be decommissioned (*) Art. 1(2)+ 2(5) + 5 (2)
TEN — E project Annex 2.1
Position at 1/1/Y
Non-operational [>3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Number Art. 5(1) b)
Max. regasification capacity [bcm(N)/y] — Art. 5(1) b)
Max storage capacity [cm] Art. 5(1) b)
Supplementary Info Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
(*) Terminals for the importation of liquefied natural gas, with a regasification capacity of 1 bcm per year or more (Annex 2.2)
NB: under construction and FID (Final Investment Decision) include renovation
[Bild bitte in Originalquelle ansehen]
Text of image
G4 — GAS STORAGE Reporting year 20XX
Member State
Type of infrastructure Annex point 2.3
Existing infrastructure Art. 5 (3)
Infrastructure under construction (*) Art. 1(2)+ 2(4) + 4+ 5 (1) a)+ Art. 4
Planned infrastructure (*) (FID) Art. 1(2)+ 2(3)+ 4 + 5 (1) a)
Additions to be commissioned (*) (Under construction + FID) Art. 1(2)+ 5 (1) c)
Infrastructure to be decommissioned Art. 1(2)+ 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [>3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Aquifer storage
Number
Total storage capacity [bcm]
Working gas Capacity [bcm]
Deliverability — Max. withdrawal capacity [mcm/d]
Injectability Max. injection capacity [mcm/d]
Salt cavity
Number
Total storage capacity [bcm]
Working gas Capacity [bcm]
Deliverability — Max. withdrawal capacity [mcm/d]
Injectability Max. injection capacity [mcm/d]
Depleted field
Number
Total storage capacity [bcm]
Working gas Capacity [bcm]
[Bild bitte in Originalquelle ansehen]
Text of image
Deliverability — Max. withdrawal capacity [mcm/d]
Injectability Max. injection capacity [mcm/d]
Aboveground storage (**)
Number
Total storage capacity [bcm]
Working gas Capacity [bcm]
Deliverability — Max. withdrawal capacity [mcm/d]
Injectability Max. injection capacity [mcm/d]
Supplementary Info Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
(*) Installations connected to the transport pipelines
(**) Does not include storage capacity of LNG terminals (see separate LNG tables)
NB: under construction and FID (Final Investment Decision) include renovation
[Bild bitte in Originalquelle ansehen]
Text of image
E1 — ELECTRICITY PRODUCTION Reporting year 20XX
Member State
Type of infrastructure Annex point 3.1
Existing infrastructure Art. 5 (3)
Infrastructure under construction Art. 1(2)+ 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID) Art. 1(2)+ 2(3) + 4 + 5 (1) a)
Additions expected to be commissioned (Under construction + FID) Art. 1(2)+ 5 (1) c)
Installations expected to be decommissioned Art. 1(2)+ 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [>3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Capacity (*) (MW)
Capacity (*) (MW)
Number
Capacity (*) (MW)
Number
Capacity (*) (MW)
Number
Capacity (*) (MW)
Capacity (*) (MW)
Number
Capacity (*) (MW)
Capacity (*) (MW)
Conventional thermal power stations (≥ 100 MW) capable of burning Annex point 3.1 + Art. 5(1) d)
Coal and lignite
with CCS/CCS ready
Oil
with CCS/CCS ready
Gas
with CCS/CCS ready
Two or more energy sources (**)
/ (*)
with CCS/CCS ready
Others
Nuclear Power Stations (≥ 100 MW) of type Annex point 3.1 + Art. 5(1) b)
Pressurized Water Reactor
Boiling Water Reactor
Graphite Gas Reactor
Fast Breeder Reactor
Others
Biomass/bioliquids/waste power generation installations (≥20 MW) capable of burning Annex point 3.1 + Art. 5(1) d)
Biomass
Waste
Bioliquids
Power stations with cogeneration of electricity and useful heat (electrical capacity ≥ 20 MW) capable of burning
[Bild bitte in Originalquelle ansehen]
Text of image
Coal and lignite
with CCS/CCS ready
Oil
with CCS/CCS ready
Gas
with CCS/CCS ready
Biomass
Waste
Two or more energy sources (**)
/
with CCS/CCS ready
Hydro-electric power stations (≥ 30 MW) of the type Annex point 3.1 + Art. 5(1) b)
Seasonal stockage (S)
Short-term stockage (ST)
Run-of River (R)
Pumped storage only (P)
Mixed pumped and others
Wind power farms (≥ 20 MW) of the type Annex point 3.1 + Art. 5(1) b)
On-shore
Off-shore
Concentrated solar thermal and geothermal installations (≥ 20 MW) Annex point 3.1
Concentrated solar thermal
Geothermal
Photovoltaic installations (≥10 MW) Annex point 3.1
Supplementary Info Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
(*) Nominal capacity
(**) For installations capable of burning more than one fuel, please indicate the power at total level and for each fuel separately
NB: under construction and FID (Final Investment Decision) include renovation
[Bild bitte in Originalquelle ansehen]
Text of image
E2 — ELECTRICITY TRANSMISSION Reporting year 20XX
Member State
Type of infrastructure Annex point 3.2
Existing infrastructure Art. 5 (3)
Infrastructure under Construction Art. 1(2)+ 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (Under construction + FID) Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
Overhead lines (≥220 kV minimum) designed for the voltage commonly used at national level for interconnections lines (select the range) Annex 3.2
AC
[220-299 kV]
[300-359 kV]
[360-499 kV]
[x]*
DC
300-499 MW
500-699 MW
700-999 MW
1000-1199 MW
other
Underground lines (≥ 150 kV)
AC
[150-199 kV]
[220-299 kV]
[300-359 kV]
[360-499 kV]
other
DC
300-499 MW
500-699 MW
700-999 MW
1000-1199 MW
other
[Bild bitte in Originalquelle ansehen]
Text of image
Submarine lines (≥ 150 kV)
AC
[150-199 kV]
[220-299 kV]
[300-359 kV]
[380-499 kV]
other
DC
300-499 MW
500-699 MW
700-999 MW
1000-1199 MW
1200-1599 MW
other
Supplementary Info Art. 5 (3)
Indication of e.g. the case of existing infrastructure non operational for a period of time exceeding 3 years
(*) Fill in in cases two voltage systems coexist within a single Member States
NB: under construction and FID ((Final Investment Decision) include renovation
[Bild bitte in Originalquelle ansehen]
Text of image
E3 — ELECTRICITY CROSS-BORDER TRANSMISSION Reporting year 20XX
Member State (MS)
Type of infrastructure Annex 3.2
Existing infrastructure Art. 5 (3)
Infrastructure under Construction Art. 1(2) +2(4)+ 4+ 5 (1) a)
Planned infrastructure (FID) Art. 1(2)+ 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned Art. 1(2) + 2(5)+ 5 (2)
TEN-E project Annex 3.
Supple- mentary info Art. 5(3)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Characteristics of section in the reporting Member State (MS)
Voltage (kV)
Trans- mission capacities (MVA - AC MW - DC)
Length (km)
Voltage (kV)
Trans- mission capacities (MVA - AC MW - DC)
Length (km)
Voltage (kV)
Trans- mission capacities (MVA - AC MW - DC)
[Yes/No]
[Yes/No]
[Yes/No]
[Yes/No]
Ref.
Overhead lines
AC
Border (MS A — MS/Country B)
Substation 1 (A)-Substation 1 (B) No 1
DC
Border (MS A — MS/Country B)
Substation 1 (A)-Substation 1 (B)
Underground lines
AC
Border (MS A — MS/Country B)
Substation 1 (A)-Substation 1 (B)
DC
Border (MS A — MS/Country B)
Substation 1 (A)-Substation 1 (B)
Submarine lines
AC
Border (MS A — MS/Country B)
Substation 1 (A)-Substation 1 (B)
DC
Border (MS A — MS/Country B)
Substation 1 (A)-Substation 1 (B)
NB: under construction and FID (Final Investment Decision) include renovation
[Bild bitte in Originalquelle ansehen]
Text of image
B1 — BIOFUEL PRODUCTION Reporting year 20XX
Member State
Type of infrastructure Annex point 4
Existing infrastructure Art. 5 (3)
Infrastructure under construction (*) Art. 1(2)+ 2(4) + 4+ 5 (1) a)
Planned infrastructure (*) (FID) Art. 1(2)+ 2(3)+ 4+ 5 (1) a)
Additions to be commissioned (*) (Under construction + FID) Art. 1(2)+ 5 (1) c)
Infrastructure to be decommissioned (*) Art. 1(2)+ 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [>3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3+5]
Annual capacity (kt)
Annual capacity (kt)
Number
Annual capacity (kt)
Number
Annual capacity (kt)
Number
Annual capacity (kt)
Annual capacity (kt)
Number
Annual capacity (kt)
Annual capacity (kt)
Installations — Un-processed refined oil (Pure Plant Oil)
Installations — Biofuel from oil crops
FAME (Fatty Acid Methyl Ester) and FAEE (Fatty Acid Ethyl Ester)
Oils (Hydrotreated and Refinery Co-Processed Oils)
Other
Installations — Biofuel from sugar and starch crops
Ethanol
ETBE
Other
Installations — Biofuel from lignocellulosics
Ethanol
Synthetic Biofuel (**)
Other
Methane installations from biogas
Supplementary Info Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
(*) Installations of a capacity ≥ 50 kt/year
(**) Fischer-Tropsh, DME, ethanol, methanol, methane, pyrolysis oil etc.
NB: under construction and FID (Final Investment Decision) include renovation
[Bild bitte in Originalquelle ansehen]
Text of image
C1 — CO2 TRANSPORT Reporting year 20XX
Member State
Type of infrastructure Annex 5.1
Existing infrastructure Art. 5 (3)
Infrastructure under construction (*) Art. 1(2) +2(4)+ 4 + 5 (1) a)
Planned infrastructure (FID) (*) Art. 1(2)+ 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID) (*) Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned (*) Art. 1(2) + 2(5)+ 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
Dry CO2 transport pipeline
Liquid CO2 transport pipeline
Total Power (MW)
Number
Total Power (MW)
Number
Total Power (MW)
Number
Total Power (MW)
Total Power (MW)
Number
Total Power (MW)
Total Power (MW)
Compressor stations
Supplementary info Indication of e.g. reasons for the investment, problems, delays for new infrastructure Art. 5(3)
(*) Pipelines related to power generation plants and refining installations
NB: under construction and FID (Final Investment Decision) include renovation
[Bild bitte in Originalquelle ansehen]
Text of image
C2 — CO2 STORAGE Reporting year 20XX
Member State
Type of infrastructure Annex point 5.2
Existing infrastructure Art. 5 (3)
Infrastructure under construction (*) Art. 1(2)+ 2(4) + 4 + 5 (1) a)
Planned infrastructure (*) (FID) Art. 1(2)+ 2(3)+ 4 + 5 (1) a)
Additions to be commissioned (Under construction + FID) (*) Art. 1(2)+ 5 (1) c)
Infrastructure to be decommissioned (*) Art. 1(2)+ 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [>3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Aquifer storage
Number
Total storage capacity [kt]
Injectability Max. injection capacity [t/d]
Depleted field
Number
Total storage capacity [kt]
Injectability capacity [t/d]
Other
Supplementary Info Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
(*) Installations with a capacity ≥ 100 kt
NB: under construction and FID (Final Investment Decision) include renovation
Markierungen
Leseansicht