Vorherige Seite
    Regulation (EU) 2019/941 of the European Parliament and of the Council of 5 June ... (32019R0941)
    1 - 247 - 48
    Nächste Seite
    EU - Rechtsakte: 12 Energy
    (b) Describe any regional and bilateral measures that have been agreed, including any necessary technical, legal and financial arrangements for the implementation of those measures. When describing such arrangements, provide information on, inter alia, the maximum quantities of electricity to be delivered at regional or bilateral level, the trigger for the assistance and possibility to request its suspension, how the electricity will be delivered, and the provisions on fair compensation between Member States. Describe the national measures necessary to implement and enforce the regional and bilateral measures agreed;
    (c) Describe the mechanisms in place for cooperation and for coordinating actions, before and during the electricity crisis, with other Member States outside of the region as well as with third countries within the relevant synchronous area.

    4.   CRISIS COORDINATOR

    Indicate and define the role of the crisis coordinator. Specify the contact details.

    5.   STAKEHOLDER CONSULTATIONS

    In accordance with Article 10(1), describe the mechanism used for and the results of the consultations carried out, for the development of this plan, with:
    (a) relevant electricity and natural gas undertakings, including relevant producers or their trade bodies;
    (b) relevant organisations representing the interests of non-industrial electricity customers;
    (c) relevant organisations representing the interests of industrial electricity customers;
    (d) regulatory authorities;
    (e) the transmission system operators;
    (f) relevant distribution system operators.

    6.   EMERGENCY TESTS

    (a) Indicate the calendar for the biennial regional (and, if applicable also national) real time response simulations of electricity crises;
    (b) In accordance with point (d) of Article 12(1), indicate procedures agreed and the actors involved.
    For the updates of the plan: briefly describe the tests carried out since the last plan was adopted and the main results. Indicate which measures have been adopted as a result of those tests.
    Markierungen
    Leseansicht
    Verwendung von Cookies.

    Durch die Nutzung dieser Website akzeptieren Sie automatisch, dass wir Cookies verwenden. Cookie-Richtlinie

    Akzeptieren